Library shelving relocation at Penryn Campus
University of Exeter · Penryn Campus, Cornwall
An expanding book collection called for more shelving in the library. Working on behalf of Rackline, Complete Workspace Solutions dismantled 60 existing static shelving bays, moved them within the same building and reassembled them in their new library location.
- Project scale
- 60 shelving bays
- System
- Static shelving
- Move
- Within one building
- CWS’s role
- Dismantle to reassemblyOn behalf of Rackline

Making room for more books
The requirement at Penryn Campus was to relocate existing static shelving into the library to accommodate its growing collection of books. The project made use of shelving already within the building, bringing it into the space where it was needed.
The scope covered 60 bays—a substantial relocation built around reusing the existing system.
The complete move, handled by CWS
Our team carried out all three parts of the relocation: dismantling the shelving, moving it within the same building and reassembling it in the library.
CWS delivered the installation work on behalf of Rackline. The photographs show the finished shelving in its new library setting.
Existing shelving. A new purpose in the library.
- 01
Dismantle
Take down the existing static shelving bays in their original location.
- 02
Relocate
Move the shelving components within the same building to the library.
- 03
Reassemble
Rebuild the 60 bays in the library to house the growing book collection.


More room for the next chapter.
Sixty existing shelving bays were relocated and reassembled in the library, providing shelving for the expanding book collection through reuse of the existing equipment.
Discuss a shelving installation or relocation →